Home / Cost guides / How much does TV aerial installation cost?

How much does TV aerial installation cost?

In Cheshire, a TV aerial price depends on where the aerial sits, how the cable runs and whether anyone must work at height. Hire an installer for the roof, and ask them to write down the access.

Last reviewed:

An aerial quote is mostly about access

Fitting a television aerial at a Cheshire house means putting an antenna where it can receive a signal, running a cable to the sets, and leaving the roof and the ceilings weatherproof and safe. One quote may assume a ladder on the drive. Another may assume time at a chimney. You should not be the person on the chimney. No figure is printed, because we could not find two dated public sources that agree on one. Ask where the aerial will sit and how the fitter will reach it.

Do not go up there

The Health and Safety Executive says working at height remains one of the biggest causes of fatal and major injury, and that common cases include falls from ladders and through fragile surfaces [S1]. Work at height means any place where, without precautions, a person could fall a distance liable to cause personal injury. A fall through a fragile roof is the example it gives [S1].

If you employ someone, or you control the work, the Work at Height Regulations 2005 are what the HSE points to, and the duties it describes are to plan the work, supervise it and use competent people with the right equipment [S1]. The order of controls is to avoid the height where reasonably practicable, then prevent a fall, then reduce how far someone could fall [S1]. A loft aerial, tried first, is sometimes the way to avoid the roof. It is not always enough. Let the installer say so. Do not test the idea by climbing into an unboarded loft or onto the tiles.

The HSE page describes, as a case study, an installer of terrestrial and satellite equipment that changed how its engineers used ladders [S1]. That case study is about a company's system. It is not a set of steps for a householder, and none of those steps are repeated here.

HSE: work at height. QuoteZila is not affiliated with this organisation.

Ladders, where they are used by the people who control the work, are for light work of short duration, a maximum of 30 minutes at a time, and not for strenuous tasks [S1]. An aerial on a chimney is a reason to ask what equipment the firm will actually bring, not a reason to borrow a ladder.

Cable, amplifier and the electrician

A cable from a loft aerial to one set may be the whole job. A new circuit to power an amplifier is electrical installation work. The Planning Portal says that work in a home in England and Wales must comply with the building regulations, and that a registered competent person can self-certify [S2]. Installing a complete new circuit is notifiable [S2]. Use a registered electrician for the circuit. Do not add sockets or open the consumer unit as part of "helping with the aerial".

Electrical Safety First: find a registered electrician; NICEIC; NAPIT. QuoteZila is not affiliated with this organisation.

A new circuit for an amplifier or a loft socket belongs with an electrician you can find on the Electrical Safety First register search, or on NICEIC or NAPIT. The aerial fitter's own page is not a substitute for that register.

Making good the cable entry, so rain does not follow the coax indoors, belongs in the aerial quote. A roofer is the other trade if the covering itself is damaged. Say if you already know the tiles are fragile.

Signal, listed houses and size

Do not treat a street name as a signal level, and do not assume a maximum aerial size, a ban on chimney mounts, or a planning fee. Listed buildings and conservation areas are a reason to ask the council first. A wall bracket for a television in the lounge is a different job.

Lines on an aerial quote

LineWhat it decides
Loft, wall or roofWhether anyone is at height [S1]
Chimney, eaves or a poleDifferent access
How they reach itLadder limits are for light, short tasks [S1]
Cable route and number of pointsThe indoor half of the job
Amplifier and any new circuitElectrical compliance if a circuit is new [S2]
Weatherproofing the entryLeaks are not "the aerial working"
Old aerial removedWeight and scrap
What "no signal" means for the priceA second visit or a different position
VAT£90,000 taxable turnover [S4]

What to send

  • Photos of the outside from the ground: chimney, eaves, and any existing dish or aerial. Do not take them from the roof.
  • How many rooms need a point.
  • Whether the loft has a boarded floor and a light. If you do not know, say you have not been up.
  • The postcode.

Jobs you might post

These are examples, not taken from real job posts.

  • "House in Crewe. One television. Please try a loft aerial if that can work, and only price roof work if you have said how you will do it safely. Do not expect us to go on the roof."
  • "Chimney aerial has come down in Sandbach. Please remove what is unsafe, fit a replacement, and include making the cable entry weatherproof. Fragile tiles: say so in the method."
  • "We want points in two rooms and an amplifier. Please price a registered electrician if a new circuit is required, separately from the aerial."

Quotes

Citizens Advice says get written quotes, at least three when you are comparing, because a quote is a fixed price and an estimate is a rough guess [S3]. A much lower price can mean the firm is not quoting for the same work [S3]. If someone knocked and offered to "re-tune the street", check what they tell you and ring the business [S3]. Ask to see insurance that covers work at height [S3]. Deposit no more than 25% if you cannot avoid one [S3].

Loft aerials, shared mastheads and the cable you already have

Not every aerial is on the ridge. A loft aerial is still work at height if a fall from the hatch or from a board could injure someone [S1]. Ask the fitter whether they propose the loft or the roof, and why, rather than expecting a street-by-street prediction. Ask them to say so before they arrive, because the quote for a loft install is a different access problem from a roof install, and a roof install is the one to leave to the fitter.

Old cable in the wall may be reusable. Ask whether the quote includes a new downlead or relies on the one that is there. A new hole through a tile or a wall is making good, and it is a rain path. The earlier section said the aerial quote should include that making good. Put it in your own post: include sealing the cable entry.

Amplifiers and multi-point feeds to a second room are where a simple hang becomes wiring. If the fitter proposes a new circuit, that is the electrician's register, not a longer aerial visit. Ask them to split the price: aerial and alignment on one line, any new circuit on another. Alignment itself, and whether they return if the picture fails the next week, should be written down. Ask the fitter to name the transmitter they are aiming at, and do not treat a street name as a signal level.

Shared systems in a block of flats are outside a householder guide. If you rent a flat, ask the freeholder before anyone mounts hardware on a shared roof. A house in Cheshire with its own roof is a different case from a shared block.

Wind, a listed building, and a conservation area are reasons to ask the council before a mast goes up. Ask the council whether any size limit applies if the house is listed or in a conservation area. A fitter who says permission is never required has not given you the council's answer.

Take the existing kit down only if the quote says the old aerial is removed and the holes are filled. Left in place, the old metal is a future leak and a future argument about whose job it was. Write "remove and make good" or write "leave the old one" so the two quotes match.

Official pages

QuoteZila is not affiliated with these organisations.

This page is general information, not professional or legal advice. QuoteZila does not check Gas Safe, WaterSafe, NFRC, NICEIC or other registrations against the register on your behalf: look them up yourself.

Where this applies. The height rules are the HSE's. They are not a call-out rate, and they are not a reception map. The electrics notes are for England and Wales [S2].

Post an aerial job

Say how many rooms, and the town. Up to five matched local businesses can reply [QZ2]. QuoteZila is free for customers and local businesses [QZ1].

Honest status: QuoteZila is new. We're starting in Cheshire, beginning with Crewe, Nantwich and Sandbach, and growing area by area. Anyone in the UK can still post a job or register a business. How fast you get quotes depends on how many local businesses have joined near you. Businesses can register and receive jobs straight away. We don't check insurance, qualifications or registrations, so please check these yourself before you hire.

Posting a job is not open yet

The trade page is aerial and satellite installers. Circuits sit with electricians. The covering sits with roofers if it is damaged. All services.

Questions about TV aerials

How much does it cost to install a TV aerial?

A loft aerial, a chimney mount and a long cable through the house are different visits. Compare quotes that name the position, the cable route and how the fitter will reach it.

Should I fit an aerial on the roof myself?

No. The Health and Safety Executive says work at height includes places where a person could fall a distance liable to cause injury, and it gives falls from ladders and through fragile roofs as common cases. Work must be planned and done by competent people, and avoided where that is reasonably practicable. Hire an installer. Do not take a ladder method from a quote.

Does an aerial count as electrical work?

Not every aerial does. If the job adds a new circuit, for example to feed an amplifier from a new outlet, electrical installation work in the home must comply with the building regulations. A new circuit is notifiable. Use a registered electrician for that part. The aerial fitter and the electrician may be two people.

What should the quote say about signal?

Where they will try the aerial first, loft or outside, and what they will do if the picture is poor. Do not expect a reception prediction for Crewe, Nantwich or any other street. A promise of a perfect picture is not a specification.

Are there planning limits for a home TV aerial?

If the house is listed or in a conservation area, ask the council before an aerial goes on the chimney, including any size limit they apply. A wall bracket for the television is a different job.

What about a deposit?

Citizens Advice says to keep an unavoidable deposit to no more than 25% and to get a receipt. Ask whether the price includes the aerial, the cable and making good the holes.

Does QuoteZila check aerial installers?

No. We don't check insurance, qualifications or registrations, so please check these yourself before you hire. You can report a quote or a business from your job page.

Can I post an aerial job?

Yes. Say loft or roof if you have a preference, how many rooms need a point, and your Cheshire postcode. Up to five matched local businesses can quote. QuoteZila is free for customers and local businesses.

Part of Cost guides. All services

Related trades

Cost guides

Related pages

Sources

  1. QZ1: QuoteZila product fact. QuoteZila pricing line.
  2. QZ2: QuoteZila product fact. QuoteZila FAQ.
  3. S1: Introduction to working at height safely, Health and Safety Executive. Accessed 2026-10-27. https://www.hse.gov.uk/work-at-height/introduction.htm
  4. S2: Building regulations: electrics, Planning Portal. Accessed 2026-10-27. https://www.planningportal.co.uk/permission/common-projects/electrics/building-regulations-general-information
  5. S3: Before you get work done on your home, Citizens Advice. Accessed 2026-10-27. https://www.citizensadvice.org.uk/consumer/getting-home-improvements-done/before-you-get-building-work-done/
  6. S4: When to register for VAT, GOV.UK. Accessed 2026-10-27. https://www.gov.uk/register-for-vat